News
NEWS

News

企业动态

For discontinued pumps, valves and piping parts, GeJiang follows five steps from…

You are here:Home > News > 企业动态

From Drawing to Delivery: Five Steps of GeJiang Custom Spare Parts

2026-11-05 14:20:00
Views:0

When marine pumps, valves or piping parts are discontinued, redesigned or have long original lead times, custom fabrication is often the practical solution. GeJiang follows five steps.

  1. Confirm the duty, medium, temperature, pressure, flow and installation space.
  2. Use drawings, old samples or on-site measurement to define the interface.
  3. Confirm material, casting or machining route, sealing arrangement and surface treatment.
  4. Machine and inspect key dimensions and pressure requirements.
  5. Protect, pack and ship with the required packing list and documents.

The aim is to combine the original mounting interface with the current operating conditions, not simply copy the old part.

Tags