During dry-docking, a coastal shipyard found several flanges and reducers in the engine room piping with special specifications; the OEM lead time was about 45 days and could not fit the seven-day window.
Requirement: manufacture flanges, elbows and reducers from old samples and on-site measurements, matching material and sealing faces, and deliver within the docking period.
GeJiang solution: we measured the parts from samples, confirmed material, pressure rating and sealing face type, arranged custom machining and dimension re-checks, and trial-fitted a single piece where necessary.
Result: the parts were delivered directly to the yard within the docking period for trial fitting, with material and dimension records; the yard added similar urgent items to our long-term cooperation.