A bulk carrier owner found that the winch brake bands, windlass gears and hydraulic motors on an 18-year-old vessel were discontinued, while the nameplates were corroded and regular channels could not quote.
Requirement: supply all deck and mooring wear parts in one batch without changing installation dimensions or operating method, and deliver before the next port call.
GeJiang solution: based on nameplate photos, installation dimensions and old samples, we selected alternatives for brake bands, windlass gears, hydraulic motors, deck bearings and O-rings; critical fit dimensions were checked item by item and differences from OEM parts were stated in writing before quotation.
Result: the spares were delivered to a domestic port in two batches according to the port call plan, with dimension and appearance inspection records; the same list was reused for sister vessels.